The launch of Groupama Team's Class AC Test (AC45 Turbo) at Multiplast

____________________________________________________________________

AC45 vue arienne

At 9.30  thrusday morning, the Groupama team France training boat, in preparation for the 35th America's Cup, was launched. 6 months were required for the French ansd Swiss divisions of the Carboman Group to combine all the elements needed in this concentration of technology.

React to the challenge

The rules set by the US defender, Team Oracle, do not permit navigation on the Coupe Class AC+ (AC50) more than 150 days before the competition and allow only one boat to be built. It was quickly apparent to the challengers that a solution was imperative in order to optimise their training time. The construction of the training boat, the Class AC Test, with the same beams and rig of the Coupe Class AC+ but with the hulls from the Class AC45, allowed them to circumnavigate this rule.

The launch of this catamaran will allow Franck Cammas and his team to start training immediately in very similar conditions to those which they will encounter on the Coupe Class AC +. The real raceboat won't leave the boatyard until the end of the year to take part in the competition in Bermuda in June 2017.

Pose dome Cathedrale russe The central dome of the Russian Orthodox Cultural and Spiritual Center in Paris is put in place by the Multiplast teams.

______________________________________________________________________
Less than a year after the project began, last Saturday, the 19th of March, saw the Multiplast team put in place the main dome of the Russian Orthodox Cathedral in Paris. This operation was performed in the presence of His Excellency Alexander ORLOV, Ambassador of the Russian Federation in France, Monseigneur NESTOR, Orthodox Bishop of France, Jean-Michel WILMOTTE, the architect in charge of the project, as well as numerous other figures from the world of politics and beyond.
                                                         


Multiplast nouveau btimentMultiplast-Groupe Carboman inaugurates its new facilities devoted to the manufacture of parts for the aerospace industry.

______________________________________________________________________
After 11 months of hard work, Multiplast's new production hall was inaugurated on friday 14th of October.

This new building will be used to manufacture series parts for the aerospace, defence and space industries, as well as housing Multiplast teams, from management to engineering and R&D.

 

Address

icon-adressMULTIPLAST S.A.S

Parc du Golfe
       24 Allée Loïc Caradec
       56000 VANNES
       France

icon-adressMail

Contact us

viber-iconPhone

Tél. +33 (0)2 97 40 98 44

GROUPE CARBOMAN
 

The book

repousser-les-limites