Groupama 3 assembled!
______________________________________________________________________
End of February, the ultimate big carbon piece of the maxi trimaran Groupama 3 has been setting up, the main sail traveller beam.
As that big sophisticated piece has been assembled, the shipyard can go to end interior work, setting up fittings and steering systems.Then, it will be the painting and decoration time, the final setting up of fittings, the setting up of electronics and general equipment.After the way out of the shed, ground test will be done before launching June 7.